BICSI recognizes 20 CEC’s upon successful completion of this Critical Path Consulting Course.
CEC's are awarded to existing credential holders only.
The Critical Path Consulting Integrated Registered Communications Distribution Design Course Certificate is a full 2-day course that provides an in-depth review to design, control and manage the installation and maintenance of network systems.
Within each three-year designation period, beginning when the exam is passed, all RCDDs must obtain a minimum of 45 approved CECs and one qualifying conference credit (conference CECs are included in the total) to recertify. If you do not recertify by your designation period end date, you may no longer use your RCDD credential or represent yourself as certified.
For More Information about the RCDD Certification visit:
BICSI Registered Communications Distribution Designer (RCDD) | BICSI
Topics Covered Include:
• Principles of Transmission
• Electromagnetic Compatibility
• Telecommunication Spaces
• Backbone Distribution Systems
• Horizontal Distribution Systems
• ICT Cables & Connecting Hardware
• Firestop Systems
• Bonding & Grounding
• Power Distribution
• Telecommunications Administration
• Field Testing of Structured Cabling
• Outside Plant
• Audiovisual Systems
• Building Automation Systems
• Data Networks
• Wireless Networks
• Electronic Safety & Security
• Data Centers
• Health Care
• Residential Cabling
• Project Administration & Execution
Required Course Material: Telecommunications Distribution Methods Manual (TDMM), 15th Edition